DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Sheridan Restoration Study Available for Comment
Business & Finance

February 13, 2018 · about 8 years ago

Sheridan Restoration Study Available for Comment

The U.S. Army Corps of Engineers is seeking comments on the recently released draft feasibility report and integrated environmental assessment for ecosystem restoration study in Sheridan, Wyoming. The draft report outlines a proposed plan to restore approximately three miles of degraded ecosystem al

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers is seeking comments on the recently released draft feasibility report and integrated environmental assessment for ecosystem restoration study in Sheridan, Wyoming.

The draft report outlines a proposed plan to restore approximately three miles of degraded ecosystem along the Little Goose Creek, Big Goose Creek, and Goose Creek in Sheridan.

The proposed plan includes: placement of in-stream structures such as boulder clusters and riffles to provide habitat and shelter for fish and other aquatic organisms, restoration of wetland, riparian and floodplain habitats to increase connectivity of upstream and downstream reaches of the creeks, and modification of the current drop structure near Lewis Street Bridge to improve fish passage for native cold water fish species.

Deadline for sending comments on the proposed work is March 12, 2018.

BACKGROUND:

In 1963, construction of the Sheridan flood control project was completed under the authority of the Flood Control Act of 1950. The project, designed to protect the city from Goose Creek and Little Goose Creek flood discharges, consists of levees, drainage structures, concrete chutes and drop structures, and channel alterations.

Although the flood control project is operating as intended, the ecosystem in the vicinity of the project has become severely degraded. In September 2014, the Sheridan City Council approved an agreement to partner with the U.S. Army Corps of Engineers on a feasibility study to evaluate possible ecosystem restoration solutions along the creeks.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free