DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy Policy
  • Report Your News

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Dredging Work at Cape Jervis Port Set to Begin
Business & Finance

April 5, 2018 · about 8 years ago

Dredging Work at Cape Jervis Port Set to Begin

Kangaroo Island Connect (KIC) has announced that the dredging plan for the Cape Jervis Port and boat ramp area has been approved and is set to kick off during the next week. KIC said that the dredging operations will begin on Tuesday, 10th April, (approval has been provided to allow rocks to be move

2 minutes read
  • LinkedIn
  • X
  • Email

Kangaroo Island Connect (KIC) has announced that the dredging plan for the Cape Jervis Port and boat ramp area has been approved and is set to kick off during the next week.

KIC said that the dredging operations will begin on Tuesday, 10th April, (approval has been provided to allow rocks to be moved to perform the required dredging), and all work will be performed in accordance with the approved methodology outlined within the EPA dredging licence.

The District Council of Yankalilla said in its announcement that “after an extensive assessment process involving council, the Dept. Planning, Transport & Infrastructure, the EPA and the Coast Protection Board, Kangaroo Island Connect (KIC) has received all necessarily approvals to dredge the Cape Jervis Port in preparation for commencing their new passenger ferry service to Kangaroo Island. ”

A long reach excavator will be used to deepen the port between the public boat ramp and the nearby breakwater, with the spoil to be located on government owned land, north of the port area.

A Dredging Management Plan and Environmental Management Plan for this work has been prepared and approved to ensure that the environment is taken into account, including water turbidity and disturbance is considerably reduced.

The approved dredging work will increase the water depth at low tide to around 1.5 to 1.7 meters deep within the basin between the boat ramp and the nearby breakwater.

According to the council, this will be beneficial to many boat users and will substantially improve access on the water, to and from the boat ramp by vessels being launched and retrieved, as well as allowing the new ferry to begin passenger pick-ups and drop offs according to their proposed operating schedule.

[mappress mapid=”25028″]

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago