Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy Policy
  • Report Your News

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USACE Plans to Remove Accumulated Sediment from LA River
Business & Finance

May 6, 2018 · about 8 years ago

USACE Plans to Remove Accumulated Sediment from LA River

The U.S. Army Corps of Engineers, Los Angeles District, has issued a Public Notice for the Draft EA for the Los Angeles River Channel Reach 5C & 6A Accumulated Material Removal Project. USACE conducted an engineering review of the Glendale Narrows in 2016 to assess the flood conveyance capacity in a

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Los Angeles District, has issued a Public Notice for the Draft EA for the Los Angeles River Channel Reach 5C & 6A Accumulated Material Removal Project.

USACE conducted an engineering review of the Glendale Narrows in 2016 to assess the flood conveyance capacity in anticipation of large rainfall associated with the predicted El Niño season. This review identified Reaches 5A, 5B, 5C and 6A of the LACDA flood risk management project as critical areas for restoring conveyance capacity.

“ The design capacity in these critical areas is a 51-year storm event or 78,000 cubic feet per second (cfs). However, the existing channel capacity in these critical areas due to vegetation and accumulated material is approximately a 7-year storm event (43,500 cfs). Of the four reaches, Reach 5C and the upstream section of Reach 6A has the greatest volume of accumulated material due to a bend in the river which causes sandbars to form against the left bank. In total, the sandbars contain approximately 40,000 cubic yards (cy) of material ,” said USACE in their release.

The main goal of this cleanup project is to remove the accumulated sediment in this river reach, and improve the conveyance capacity of the channel.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago
The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago