Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy Policy
  • Report Your News

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Avalon Coastal Protection Project Kicks Off
Business & Finance

May 7, 2018 · about 8 years ago

Avalon Coastal Protection Project Kicks Off

The Avalon Department of Public Works has started the 2018 sand backpassing program, the Borough of Avalon, New Jersey, said in their latest release. The Avalon Department of Public Works is conducting the project under the direction of Mott MacDonald, Avalon’s municipal engineering firm. According

1 minutes read
  • LinkedIn
  • X
  • Email

The Avalon Department of Public Works has started the 2018 sand backpassing program, the Borough of Avalon, New Jersey, said in their latest release.

The Avalon Department of Public Works is conducting the project under the direction of Mott MacDonald, Avalon’s municipal engineering firm.

According to the official announcement, sand is being backpassed from an authorized borrow area to eroded northend beaches.

Four nor’easter storms in March severely eroded the beaches in Avalon’s north end, especially between 9th-14th streets. Sand will be scraped from the beaches where it was transported in a north to south location and placed back to provide a protective beach for the upcoming hurricane season.

In 2016, approximately 2,500 cubic yards of sand were moved a day during the backpassing project. The volume of sand to be moved is dependent on the new surveys that will be conducted this week; it is anticipated that the Borough will need less than half of the sand that is available in the borrow area.

According to the Borough of Avalon’s announcement, it is expected that this coastal protection program will be concluded before Memorial Day weekend.

[mappress mapid=”25104″]

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago