Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy Policy
  • Report Your News

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Massachusetts DCR Seeks USACE’s Permit for Nantasket Beach Works
Business & Finance

May 15, 2018 · about 8 years ago

Massachusetts DCR Seeks USACE’s Permit for Nantasket Beach Works

The Massachusetts Department of Conservation and Recreation (DCR) is seeking a permit from USACE’s New England District to conduct work in waters of the U.S. in conjunction with the placement of dredged sand onto Nantasket Beach in Hull, Mass. According to USACE, this work is proposed in Massachuset

1 minutes read
  • LinkedIn
  • X
  • Email

The Massachusetts Department of Conservation and Recreation (DCR) is seeking a permit from USACE’s New England District to conduct work in waters of the U.S. in conjunction with the placement of dredged sand onto Nantasket Beach in Hull, Mass.

According to USACE, this work is proposed in Massachusetts Bay/Nantasket Beach from State Park Road to Phipps Street in Hull.

Proposed work involves placement of 372,900 cubic yards of sand below the high tide line (HTL) on Nantasket Beach.

Sand will cover 2.26 million square feet (52 acres) below the HTL at depths ranging up to 3.6 feet. Sand will be sourced from a dredging project on the Piscataqua River in New Hampshire and Maine sponsored by USACE.

Vessels (tug/scows) with sand will make multiple trips between the Piscataqua River site and Nantasket Beach to reload with sand. The sand will be pumped to shore from a barge (carrying the pump) anchored approximately 2,600 feet from shore.

The frequency of trips by the tugs/scows will be determined by the dredging schedule at the Piscataqua River site.

At some point in the future the applicant intends to place an additional 322,000 cubic yards of sand on Nantasket Beach – the source and timing of this nourishment is not known and therefore not part of this permit review.

[mappress mapid=”25140″]

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago