Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy Policy
  • Report Your News

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Dredging About to Begin at Point Grey, Mandurah
Business & Finance

May 24, 2018 · about 8 years ago

Dredging About to Begin at Point Grey, Mandurah

Maintenance dredging that will widen and restore safe navigation depths to the Point Grey Channel – the waterway linking the Peel Inlet, Dawesville Channel and Harvey Estuary – is about to begin any time now, reports the WA Department of Transport. DoT Coastal Infrastructure General Manager, Steve J

1 minutes read
  • LinkedIn
  • X
  • Email

Maintenance dredging that will widen and restore safe navigation depths to the Point Grey Channel – the waterway linking the Peel Inlet, Dawesville Channel and Harvey Estuary – is about to begin any time now, reports the WA Department of Transport.

DoT Coastal Infrastructure General Manager, Steve Jenkins, said that dredging was vital for continued safe access for recreational and commercial craft through the waterway.

“ The $675,000 project will take three months to complete and see approximately 13,000 cubic meters of sand taken from the channel, ” Mr Jenkins said. “ The dredged material, to be pumped through a series of floating and submerged pipes, has been approved to be deposited in the Peel Inlet 600 meters north east of the eastern end of the channel .”

According to DoT, the works will be carried out by the 18 meter cutter suction dredge ‘Mudlark I’, equipped with a 60 meter floating pipeline marked with orange buoys equipped with flashing lights.

An additional barge will also be located approximately 600 meters east of the Harvey Channel, connected to floating pipeline. This area will be delineated with yellow marker buoys, equipped with flashing yellow lights.

The last dredging in this area, also known as the Zig Zag Channel, was completed in 2003.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago