Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy Policy
  • Report Your News

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Oceanside Maintenance Dredging Project Postponed
Business & Finance

May 24, 2018 · about 8 years ago

Oceanside Maintenance Dredging Project Postponed

The U.S. Army Corps of Engineers’ Los Angeles District announced on May 23 it would delay it’s annual maintenance dredging of Oceanside Harbor, typically expected to begin in April. As USACE reported, the water quality certification used in previous dredging operations expired and a new Section 401

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers’ Los Angeles District announced on May 23 it would delay it’s annual maintenance dredging of Oceanside Harbor, typically expected to begin in April.

As USACE reported, the water quality certification used in previous dredging operations expired and a new Section 401 permit was not obtained in order to conduct dredging in May.

The Corps also added that they will coordinate with Oceanside officials to determine if dredging is necessary in the fall or if it should occur in spring 2019.

“ Corps survey crews are monitoring the harbor’s entrance channel to ensure sufficient depth for safe navigation. Plans call for the Corps to work with the Harbor Patrol to do monthly depth checks to monitor the progression of tip shoals that form on the north and south jetties that could encroach on the channel ,” USACE announced.

Oceanside Harbor navigational dredging is an annual project conducted to maintain the federal channel within the harbor at its authorized depth and to provide safe navigation for the recreational, commercial and military vessels that use the channel.

In 2017, Corps contractor Manson Construction successfully removed 440,000 cubic yards of beach quality sand from the harbor and placed it along Oceanside’s beaches. Typical years see an average of about 250,000 cubic yards of dredged material from the harbor.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago