Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy Policy
  • Report Your News

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Schumer Strongly Pushes for Mamaroneck-Sheldrake River Project
Business & Finance

May 29, 2018 · about 8 years ago

Schumer Strongly Pushes for Mamaroneck-Sheldrake River Project

New York Senators Charles E. Schumer and Kirsten Gillibrand, and U.S. Representative Eliot Engel yesterday announced that they were successful in securing an authorization for the Mamaroneck-Sheldrake River project in the Water Resource Development Act (WRDA). The project, once complete, will includ

2 minutes read
  • LinkedIn
  • X
  • Email

New York Senators Charles E. Schumer and Kirsten Gillibrand, and U.S. Representative Eliot Engel yesterday announced that they were successful in securing an authorization for the Mamaroneck-Sheldrake River project in the Water Resource Development Act (WRDA).

The project, once complete, will include the construction of retaining walls and a diversion culvert, and will enable the deepening and widening of river channels, structure elevation, and the removal/replacement of 2 vehicular bridges that constrict flood flow.

According to the reps, the recommended plan is estimated to reduce average annual damages by approximately 87 percent and will help reduce the risk of loss of life.

“ Making sure the Village of Mamaroneck is protected from future flooding is critical for public safety and property preservation of homes and businesses ,” said Senator Schumer.

“ Floods have hammered this area before and we can’t wait any longer before we implement a better flood protection plan for the whole community, which is why I, along with Senator Gillibrand and Representative Engel, fought so hard to have the project authorized in the WRDA bill.

“Now with the authorization moving forward, we can work to make sure the project stays on track, so we can finally break ground on this vital project that is essential to saving lives and protecting the Village of Mamaroneck from the storms of the future.”

Senators Schumer, Gillibrand and Representative Engel, who announced that USACE at their urging reviewed and approved the Chief’s Report, said that Congressional authorization of the project will allow USACE to move forward with the design and construction of the project to reduce flood risk for the Mamaroneck and Sheldrake River Basins, and thus protect residents and business owners from future flooding.

[mappress mapid=”25187″]

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago