Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy Policy
  • Report Your News

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Fairfield Beaches to Get New Sand
Business & Finance

June 5, 2018 · about 8 years ago

Fairfield Beaches to Get New Sand

The Town of Fairfield is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the U.S. in conjunction with constructing engineered beaches in Fairfield, Conn. According to the Corps, the work is proposed in Long Island Sound at the following locat

1 minutes read
  • LinkedIn
  • X
  • Email

The Town of Fairfield is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the U.S. in conjunction with constructing engineered beaches in Fairfield, Conn.

According to the Corps, the work is proposed in Long Island Sound at the following locations in Fairfield: Southport Beach (1505 Pequot Avenue); South Pine Creek Beach (Terminus of South Pine Creek Road); Penfield Beach (323 Fairfield Beach Road); Sasco Beach (1401 Sasco Hill Road); and Jennings Beach (880 South Benson Road).

The proposed work involves the placement of excavated and possibly nourishment material below the high tide line of Long Island Sound in order to construct engineered beaches at these locations in order to retain the recreational beach on site in response to on-going erosion and storm resiliency.

Also included in the project is the grading and scraping of the beach from the mean low water mark to the high tide line in order to maintain the designed beach profile at each location.

In the event that additional material is required to maintain the beaches, the Town is requesting a 10-year permit which would allow the Town to nourish the beaches in order to maintain the beach profile.

Deadline for sending public comments on this work proposed by the Town of Fairfield is July 5, 2018.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago