Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›New Electric Bucketwheel Dredge from Ellicott
Business & Finance

June 6, 2018 · about 8 years ago

New Electric Bucketwheel Dredge from Ellicott

In 2017, a petrochemical customer approached Ellicott Dredges about building a customized electric bucketwheel dredge. The customized dredge had to be designed to withstand desert-like conditions, the Baltimore-based builder of medium sized cutter suction dredges said in its announcement. The most s

1 minutes read
  • LinkedIn
  • X
  • Email

In 2017, a petrochemical customer approached Ellicott Dredges about building a customized electric bucketwheel dredge.

The customized dredge had to be designed to withstand desert-like conditions, the Baltimore-based builder of medium sized cutter suction dredges said in its announcement.

The most significant challenge facing the team from Ellicott was the ability to transport a 1MM lb. (453,592.3 kg) dredge halfway around the world. During the beginning stages of the project, a team from Ellicott’s Major Projects division sprang into action and discovered a solution to the problem.

“ Thanks to some creative thinking, they decided to design and build a dredge that was capable of being disassembled, easily transported over road and sea, and reassembled at the customer’s project site ,” Ellicott said.

The new customized dredge is equipped with Ellicott’s patented Dual-Wheel Excavator (DWE) 94 600HP cutter engine.

Due to the nature of work that’s involved the equipment on board the dredge is suitable for a highly corrosive environment.

After spending several months assembling the customized electric Bucketwheel dredge and undergoing testing, the team from Ellicott Dredges has announced that the final stages of construction are now complete.

In May, a crew from Ellicott Dredges completed disassembly of the dredge. Various dredge sections and components were shipped breakbulk and crated in containers and then placed on a vessel that set sail for delivery from the Port of Baltimore.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnologyVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

13 days ago