Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy Policy
  • Report Your News

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Record Dredging Year for Broads Authority
Business & Finance

June 7, 2018 · about 8 years ago

Record Dredging Year for Broads Authority

The Broads Authority is celebrating a record breaking year for its dredging operations team reaching 110% of their estimated dredging target figure. Each year the Broads Authority Construction Team aims to remove around 50,000m³ of accumulated sediment from the rivers and broads in the national park

2 minutes read
  • LinkedIn
  • X
  • Email

The Broads Authority is celebrating a record breaking year for its dredging operations team reaching 110% of their estimated dredging target figure.

Each year the Broads Authority Construction Team aims to remove around 50,000m³ of accumulated sediment from the rivers and broads in the national park.

This is because the gradual build-up of sediment which occurs reduces the navigable capacity of the waterways. Dredging to remove this sediment build up is one of the key responsibilities of the Broads Authority.

According to the Authority, the dredged sediment is now being used to repair flood bank defenses, re-creating eroded or lost river bank habitats and as a soil conditioner to improve agricultural soil quality.

The Broads Authority’s ability to re-use dredged sediments has opened new locations to deposit dredged arisings, including a large area of the Lower Bure where the sediment will be allowed to naturally dry and then be used to ‘crest-raise’ the flood bank.

Sediment was also pumped from Hickling Broad to a local arable field where it will be dried and used as a soil-enhancer for sugarbeet crops. The sediment has equally enhanced a sidecast project, being used to strengthen the riverbanks along the River Chet.

Thanks to these new opportunities to recycle the sediment for an alternative purpose, the Broads Authority removed 58,540m³ of material between 2017 and 2018, reaching 110% of their estimated target of 53,000m³. The bumper sediment removal in 2017 and 2018 means that the Broads Authority can concentrate on restoring their deposition sites in 2019.

The Broads Authority’s Director of Operations, Rob Rogers , said of the achievement, “ We have been changing the plant and equipment we use to dredge and developing exciting, innovative re-use opportunities to manage dredged sediments whilst working with local landowners to find sustainable solutions.”

The construction team will continue to seek sediment deposition sites which present a ‘multi-benefit’ opportunity to re-use the dredged sediment in a positive way to restore and enhance the Broads National Park.

2018 and 2019 will see the latest phase of the Hickling Vision progress with detailed designs and planning permission sought to re-create a large area of reed swamp which should result in significant ecological benefits for the national park.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago