Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Cavache Wins Intracoastal Waterway Dredging Contract
Business & Finance

June 18, 2018 · about 8 years ago

Cavache Wins Intracoastal Waterway Dredging Contract

The U.S. Army Corps of Engineers awarded a maintenance dredging contract for portions of the Intracoastal Waterway (IWW) and the Ponce de Leon Inlet in Volusia County June 15. The Corps awarded the $8.55 million contract to Cavache, Inc. of Pompano Beach Florida. The maintenance contract will dredge

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers awarded a maintenance dredging contract for portions of the Intracoastal Waterway (IWW) and the Ponce de Leon Inlet in Volusia County June 15.

The Corps awarded the $8.55 million contract to Cavache, Inc. of Pompano Beach Florida.

The maintenance contract will dredge sand deposited in the waterways with the passage of hurricanes Matthew and Irma, and two nor’easters. The Corps anticipates dredging will start in August and take about eight months to complete.

Work consists of maintenance dredging approximately 500,000 cubic yards of material from the IWW in the vicinity of Ponce de Leon Inlet from Cut V-22 to Cut V-35 to a depth of 12 feet plus 2 feet of allowable over-depth, and the Ponce de Leon Inlet navigation channel from Cut-1A to Cut-5N to a depth of 12 feet plus 2 feet of allowable over-depth.

According to the Corps, Cavache will place excavated material in a nearshore area about 1.6 miles south of the inlet. The excavated material will be piped via a pipeline down the waterway then transferred through an existing pipeline sleeve which is located at Sapphire Road and Maryanne Clancy Park which emerges onto the New Smyrna Beach and then placed in the nearshore.

The project also consists of dredging approximately 10,000 cubic yards of material from the Coast Guard Station at Ponce Inlet and placing it in the Rose Bay disposal area. Additional work includes turbidity and endangered species monitoring.

Consolidating these dredging projects is anticipated to result in a cost savings of $1.5 million. Placement of the dredged material in the nearshore of New Smyrna Beach brings dredging and coastal protection together through regional sediment management (RSM).

The mission of RSM is to use sand or sediment that is dredged from navigation channels and places it on or near shorelines to nourish beaches and reduce risks to landside infrastructure. Numerous wildlife species rely on these healthy beaches as a place to live, feed, rest and nest.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago