Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Darien Beach Nourishment Project up for Comment
Business & Finance

June 20, 2018 · about 8 years ago

Darien Beach Nourishment Project up for Comment

The Tokeneke Club, Inc. is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the U.S. in conjunction with nourishing and grading a beach in Darien, Conn. According to the Corps, this work is proposed in Long Island Sound at 4 Butlers Island Roa

1 minutes read
  • LinkedIn
  • X
  • Email

The Tokeneke Club, Inc. is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the U.S. in conjunction with nourishing and grading a beach in Darien, Conn.

According to the Corps, this work is proposed in Long Island Sound at 4 Butlers Island Road in Darien.

The proposed work involves the placement of fill material below the high tide line of waters of the U.S. in order to nourish and grade the beach at the Tokeneke Club.

Approximately 11,660 cubic yards of sand will be placed on an 84,900-square-foot area of the beach above and below the high tide line. This includes a 57,660-square-foot area below the high tide line of which 6,520 square feet is subtidal.

The proponent has stated that the purpose of this project is to protect the upland structures from storm damage by breaking waves offshore and preventing them from reaching the adjacent structures.

Additionally, the proposed project also will add resiliency to the beach, which has a history of weathering and erosion from storm events.

Deadline for sending public comments on the proposed work is July 19, 2018.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago