Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Plan for Long Island Sound Groin Reconstruction on Display
Business & Finance

June 26, 2018 · about 8 years ago

Plan for Long Island Sound Groin Reconstruction on Display

Permit applicant Mark Lender is seeking a permit from the U.S. Army Corps of Engineers, New England District, to conduct work in waters of the U.S. in conjunction with placing stones to reconstruct a groin in Long Island Sound, Clinton, Conn. The proposed work involves the placement of 80 cubic yard

2 minutes read
  • LinkedIn
  • X
  • Email

Permit applicant Mark Lender is seeking a permit from the U.S. Army Corps of Engineers, New England District, to conduct work in waters of the U.S. in conjunction with placing stones to reconstruct a groin in Long Island Sound, Clinton, Conn.

The proposed work involves the placement of 80 cubic yards of stone into a 360-square-foot area of Long Island Sound in order to reconstruct a groin that was originally constructed sometime in the early 1900s, but is not currently serviceable and is in disrepair.

The original groin was approximately 50 feet long by 6 to 8 feet wide, but has been displaced and at present covers a 900-square-foot area. The reconstructed groin is proposed to match the original footprint but also extend an additional 10 feet into Long Island Sound. The proposed groin will begin at the existing seawall and extend 60 feet waterward.

According to USACE, the proposed groin will be approximately 6 feet wide and range in elevation above the substrate from 3.5 feet to 6 feet.

The permit applicant stated that the groin is capable of protecting adjacent residences while not preventing sediment from moving to the other local beaches.

Additionally, the applicant has stated that the groin will maximize the width of the beach in front of the residences it protects, while not significantly impacting neighboring beaches.

Public comments on this work should be forwarded no later than July 26, 2018 to the U.S. Army Corps of Engineers, New England District.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago