Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USACE VIDEO: Rhodes Point Project on Display
Business & Finance

July 2, 2018 · about 8 years ago

USACE VIDEO: Rhodes Point Project on Display

The U.S. Army Corps of Engineers, Baltimore District, through a contract with Coastal Design & Construction Inc., last month completed the construction of two jetties to prevent shoaling in the channel and to reduce the continual need for dredging at Rhodes Point on Smith Island. The construction of

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Baltimore District, through a contract with Coastal Design & Construction Inc., last month completed the construction of two jetties to prevent shoaling in the channel and to reduce the continual need for dredging at Rhodes Point on Smith Island.

The construction of a stone sill was also completed along 850 feet of eroding shoreline south of the mouth of Sheep Pen Gut to prevent further erosion and contain material dredged as part of the project. Another part of this navigation improvement project includes realignment of a portion of the federal navigation channel in Sheep Pen Gut through dredging.

The goal of this project is to improve navigation, prevent further erosion and to provide boaters from the Smith Island towns of Rhodes Point and Tylerton with more direct access to the Chesapeake Bay.

In addition, vegetation will be planted on the clean dredge material placed behind the stone sill. The intent is to help restore, enhance and protect wetlands, as well as increase shoreline resiliency.

This project is funded through the Corps, Maryland Department of Natural Resources, and the Maryland Department of Housing and Community Development. The funding through the Department of Housing and Community Development came from a HUD Community Development Block Grant that stemmed from Hurricane Sandy.

HUD gave the money to the Department of Housing and Community Development, and the Department of Housing and Community Development awarded the funding to Somerset County.

U.S. Army video by Sarah Lazo

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 9 months ago