Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›CEDA: Working Group on Turbidity Limits Starts Its Work
Business & Finance

July 9, 2018 · about 8 years ago

CEDA: Working Group on Turbidity Limits Starts Its Work

The working group on turbidity limits (WGETL) has started its work, Central Dredging Association (CEDA) said in its latest announcement. “Turbidity limits are often encountered by the dredging industry around the world and often significant resources are used to comply with turbidity limits. It is t

1 minutes read
  • LinkedIn
  • X
  • Email

The working group on turbidity limits (WGETL) has started its work, Central Dredging Association (CEDA) said in its latest announcement.

“ Turbidity limits are often encountered by the dredging industry around the world and often significant resources are used to comply with turbidity limits. It is therefore very important that the imposed turbidity limits are optimized to protect the local environment ,” said CEDA.

Environmental turbidity limits for dredging operations should always be site-specific, and based on ecosystem functioning, in order to protect sensitive environmental receptors. By setting realistic limits, monitoring can be made more cost-effective and ecologically, and socially, relevant.

The new working group, consists of 13 members representing both contractors, consultants, researchers and contract holders. Their task will be to prepare a CEDA information paper on guidelines for assessing and evaluating environmental turbidity limits for dredging.

The aim of the paper is to facilitate knowledge exchange on how to assess environmental turbidity limits generally, and which parameters should be included in the evaluation at a local level.

The paper will also seek to provide support for legislators, and environmental authorities, in setting the right thresholds, and to encourage contractors and consultants to challenge existing limits which are not site-specific or scientifically based.

The paper is scheduled for June 2019, CEDA said.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

14 days ago