Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Field Studies Continue at Roberts Bank
Business & Finance

July 31, 2018 · about 8 years ago

Field Studies Continue at Roberts Bank

The Vancouver Fraser Port Authority (VFPA) is continuing field studies in August 2018 as part of ongoing environmental and technical work for the Roberts Bank Terminal 2 Project. The Roberts Bank Project is a proposed new three‐berth container terminal that would provide 2.4 million TEUs of addition

1 minutes read
  • LinkedIn
  • X
  • Email

The Vancouver Fraser Port Authority (VFPA) is continuing field studies in August 2018 as part of ongoing environmental and technical work for the Roberts Bank Terminal 2 Project.

The Roberts Bank Project is a proposed new three‐berth container terminal that would provide 2.4 million TEUs of additional container capacity annually.

The project is undergoing a federal environmental assessment by an independent review panel, under the Canadian Environmental Assessment Act, 2012, and requires other permits and authorizations before it can proceed.

The Port of Vancouver has provided an overview of field studies that will be taking place in August 2018:

According to the Port, the purpose of these studies is to determine the physical conditions (e.g., temperature and salinity) influencing biofilm presence and distribution at Roberts Bank. The Roberts Bank study area is located in the upper and mid intertidal zones north of the Roberts Bank causeway.

The Port also added that during the field studies water quality measurements (conductivity, temperature and depth) will be recorded in the mid and upper intertidal zones of Roberts Bank.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

about 1 month ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago