Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Burlington Bay Project Available for Comment
Business & Finance

August 8, 2018 · about 8 years ago

Burlington Bay Project Available for Comment

The Lake Champlain Transportation Company is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the U.S. to expand and maintain an existing marina in Burlington Bay in Burlington, Vermont. The Company proposed to expand and maintain an existing

1 minutes read
  • LinkedIn
  • X
  • Email

The Lake Champlain Transportation Company is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the U.S. to expand and maintain an existing marina in Burlington Bay in Burlington, Vermont.

The Company proposed to expand and maintain an existing commercial marina and reconfigure existing ferry slips in Burlington Bay of Lake Champlain off of King Street in Burlington.

According to the Corps, proposed work includes expansion and maintenance of the existing docking facility, reconfiguration of the existing ferry slips, reconstruction of the existing retaining wall and maintenance dredging works.

Maintenance dredging will be performed in an approximately 9,350-square-foot area within the basin to a depth of approximately 8 feet below the horizontal plane of mean low water. The dredged material will be disposed of at an upland, non-wetland location offsite.

Deadline for sending public comments on this work proposed by the Lake Champlain Transportation Company is September 6, 2018.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1BREAKING NEWS: Dredging work underway for Iraq’s first LNG import terminal
  2. 2Jan De Nul: Spotlight on Bankbusters project
  3. 3Marina de Lagos expansion: New berths enter final stretch
  4. 4Secretary Dizon: President Marcos wants all waterways in Naga City dredged

Related articles

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago
The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago