Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Florida ICWW Dredging Plan Introduced
Business & Finance

September 11, 2018 · about 8 years ago

Florida ICWW Dredging Plan Introduced

The Florida Inland Navigation District will be receiving sealed bids for the construction of the Intracoastal Waterway Maintenance Dredging project at its offices in Jupiter, Florida until 2 PM, October 4, and then the bids will be publicly opened. “The District will award the project to the qualifi

1 minutes read
  • LinkedIn
  • X
  • Email

The Florida Inland Navigation District will be receiving sealed bids for the construction of the Intracoastal Waterway Maintenance Dredging project at its offices in Jupiter, Florida until 2 PM, October 4, and then the bids will be publicly opened.

“The District will award the project to the qualified, responsible, and responsive bidder presenting the lowest bid, ” they said in its release.

The base project generally entails dredging approximately 90,000 CY of material from ±4.5 miles of the Intracoastal Waterway (ICWW) between the Port of Palm Beach to the Town of Palm Beach Docks to a depth of -12 feet Mean Lower Low Water, (MLLW).

In accordance with permit conditions, material should be dredged via the use of either a mechanical or hydraulic dredge to remove all material from the dredge template. Dredged material should be offloaded at a District-owned ±17-acre dredged material management area (DMMA) located on the north end of Peanut Island.

The Alternate Bid Item includes the removal and disposal of a 5-inch AT&T abandoned conduit that lies within the Intracoastal Waterway channel bottom.

The successful Bidder will have 180 days from the Notice to Proceed to complete the entire project, according to the release.

The District will hold a mandatory pre-bid meeting at 11:00 AM, September 20, at the project site.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago