Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›PHOTO: TSHD Magdalen Returns to Long Beach Island
Business & Finance

September 20, 2018 · about 7 years ago

PHOTO: TSHD Magdalen Returns to Long Beach Island

After nearly two weeks of severe weather, the dredger Magdalen returned to Long Beach Island, NJ, yesterday to resume dredging and beachfill work, the U.S. Army Corps of Engineers’ Philadelphia District said in their latest announcement. The twin-screw trailing suction hopper dredger (TSHD) is owned

1 minutes read
  • LinkedIn
  • X
  • Email

After nearly two weeks of severe weather, the dredger Magdalen returned to Long Beach Island, NJ, yesterday to resume dredging and beachfill work, the U.S. Army Corps of Engineers’ Philadelphia District said in their latest announcement.

The twin-screw trailing suction hopper dredger (TSHD) is owned and operated by Weeks Marine Inc.

The Magdalen is one of the two newest, and among the largest, hopper dredges in the U.S. She is self-propelled and will bring formidable pumping power to off-load beach quality sand or other materials for land reclamation.

The dune and berm project is designed to reduce the risk of storm damages to homes, businesses and infrastructure.

USACE awarded a contract to Weeks to repair and renourish the three sections of the project that were constructed prior to Hurricane Sandy: Harvey Cedars, Surf City and a section of Brant Beach in Long Beach Township.

The contract calls for the dredging, pumping and placement of sand as well as dune repairs; crossovers and sand fencing repairs; and dune grass plantings. Beaches will be constructed from 100 feet to 300 feet wide in front of the dune system.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago