Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USACE Repairs Union Slough Levee Along Snohomish River
Business & Finance

September 26, 2018 · about 7 years ago

USACE Repairs Union Slough Levee Along Snohomish River

The Union Slough Levee near Everett, Washington, is getting repairs starting this week, when U.S. Army Corps of Engineers’ officials will begin restoring approximately 1,245 feet of damage in four sections along the Snohomish River. The project will cost approximately $1.1 million, USACE said. Three

1 minutes read
  • LinkedIn
  • X
  • Email

The Union Slough Levee near Everett, Washington, is getting repairs starting this week, when U.S. Army Corps of Engineers’ officials will begin restoring approximately 1,245 feet of damage in four sections along the Snohomish River.

The project will cost approximately $1.1 million, USACE said.

Three of the repair sites will be near 28th Place Northeast and one will be adjacent to the Everett water treatment plant on 4th Street Southeast.

The Snohomish River exceeded flood stage in November 2017. The high river flows in the Snohomish River resulted in erosion of the riverward levee slope and toe, including loss of riprap and embankment material up to several feet above the water level. The damage reduced the levee to a 1-year level of protection.

The Union Slough Levee is approximately 41,000 feet long and protects much of Smith Island near the City of Everett including the City’s Water Pollution Control Facility, dozens of homes and local businesses, a marina and communication cables.

Once repaired, the levee will be restored to its pre-flood 30-year level of protection, according to USACE.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago