Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›New Haven Harbor Feasibility Report Available for Review
Business & Finance

September 30, 2018 · about 7 years ago

New Haven Harbor Feasibility Report Available for Review

A Draft Integrated Feasibility Report and Environmental Impact Statement (D-IFR/EIS) has been prepared as part of the New Haven Harbor Navigation Improvement Project Study (NHHNIP), the U.S. Army Corps of Engineers’ New England District said in its latest post. To facilitate efficient and safe navig

1 minutes read
  • LinkedIn
  • X
  • Email

A Draft Integrated Feasibility Report and Environmental Impact Statement (D-IFR/EIS) has been prepared as part of the New Haven Harbor Navigation Improvement Project Study (NHHNIP), the U.S. Army Corps of Engineers’ New England District said in its latest post.

To facilitate efficient and safe navigation and marine commerce in New Haven Harbor in New Haven, Conn., navigation improvements (i.e., deepening and widening) to the existing Federal navigation project were studied.

The proposed project consists of deepening the main ship channel, maneuvering area, and turning basin to -40 feet MLLW and widening the main channel and turning basin to allow larger vessels to efficiently access the Port of New Haven’s terminals.

The proposed improvements would remove about 4.28 million cubic yards of predominately glacially deposited silts from the Federal channel. Additionally, approximately 43,500 cubic yards of rock would be blasted and removed from the channel.

According to USACE, several feasible alternative dredged material placement sites were identified and include:

Comments concerning the D-IFR/EIS are requested to be submitted by November 15, 2018.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago