Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USACE, CPRA Ink Agreements for Four Flood Risk Reduction Studies
Business & Finance

October 12, 2018 · about 7 years ago

USACE, CPRA Ink Agreements for Four Flood Risk Reduction Studies

The U.S. Army Corps of Engineers and State of Louisiana’s Coastal Protection and Restoration Authority (CPRA) have signed partnering agreements to initiate four flood and storm damage risk reduction feasibility studies in South Louisiana. Col. Michael Clancy, commander of the USACE New Orleans Distr

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers and State of Louisiana’s Coastal Protection and Restoration Authority (CPRA) have signed partnering agreements to initiate four flood and storm damage risk reduction feasibility studies in South Louisiana.

Col. Michael Clancy, commander of the USACE New Orleans District, and CPRA Chairman Johnny Bradberry signed Feasibility Cost Share Agreements for the South Central La. feasibility study, Upper Barataria Basin feasibility study, Lake Pontchartrain and Vicinity (LPV) General Reevaluation Report and West Bank and Vicinity (WBV) General Reevaluation Report.

Each study was recently funded by the Bipartisan Budget Act of 2018 to be conducted at full federal expense up to $3 million.

“The people in these project areas are frequently subjected to significant flood events ,” said Col. Michael Clancy . “These studies allow an evaluation of traditional and innovative alternatives for reducing their vulnerability to flood and storm damage.”

“Reducing storm damage risk for Louisiana’s coastal communities is critical to our mission. Once completed, these studies will further identify and propose solutions to reduce vulnerability and improve the resiliency of our coastal communities ,” said CPRA Chairman Johnny Bradberry.

The South Central Louisiana Coastal Flood Risk Reduction study was authorized in 2006 to determine the feasibility of providing hurricane and storm damage risk reduction and environmental restoration within Iberia, St. Mary and St. Martin parishes.

Flood risk management approaches that may be considered include levees and floodwalls, hydraulic and salinity control structures, marsh creation and restoration, non-structural efforts and shoreline stabilization measures.

The Upper Barataria Basin Flood Risk Management study, authorized in 1998, will investigate alternatives to address flood risk from tidal surges, coastal storms and heavy rainfall in the area between Bayou Lafourche and the Mississippi River system.

The study will evaluate a range of structural and non-structural approaches to regulate upper basin stages and storage capabilities. Possible solutions include a combination of small scale levees and floodwalls, conveyance channels, flood gates, tidal exchange structures, flood walls and pumping stations.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago