Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›All Set for Oceanside Harbor Dredging
Business & Finance

October 15, 2018 · about 7 years ago

All Set for Oceanside Harbor Dredging

The preparations activities for the Oceanside Harbor dredging program are in full swing now, according to the City of Oceanside Harbor’s latest announcement. Manson Construction, the USACE’s contractor, will begin the work in the following days, after environmental restrictions – which include dredg

1 minutes read
  • LinkedIn
  • X
  • Email

The preparations activities for the Oceanside Harbor dredging program are in full swing now, according to the City of Oceanside Harbor’s latest announcement.

Manson Construction, the USACE’s contractor, will begin the work in the following days, after environmental restrictions – which include dredging during the California least tern nesting season – have ended.

Dredge pipe is continuing to be delivered by truck and assembled on Harbor Beach. The initial section of pipe will be pulled by tractor from Harbor Beach south onto the river bed.

Additional pipe to be laid on the beach in front of North Coast Village was scheduled for this week.

“ The actually dredging of the harbor entrance is expected to start on October 17 or 18. If weather permits, the dredging should be completed by Monday October 29. Demobilization should occur from October 29 to November 5, ” the city said.

Survey crews have been monitoring the harbor’s entrance channel on a periodic basis to ensure sufficient depth for safe navigation. Results from a July 30 survey indicated a significant amount of shoaling around the south jetty tip, and the western portion of the entrance channel was at a depth of 16 feet.

Cost of the fall dredging is about $3.5 million.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago