Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›JBA Wins Contract for Robin Hood’s Bay Coastal Defense Design
Business & Finance

October 18, 2018 · about 7 years ago

JBA Wins Contract for Robin Hood’s Bay Coastal Defense Design

Scarborough Borough Council has approved the appointment of a contractor to design a scheme to repair and improve Robin Hood’s Bay’s main coastal defense asset. Previous studies have shown that the concrete seawall in the popular Yorkshire coast village is in poor condition and has an estimated serv

2 minutes read
  • LinkedIn
  • X
  • Email

Scarborough Borough Council has approved the appointment of a contractor to design a scheme to repair and improve Robin Hood’s Bay’s main coastal defense asset.

Previous studies have shown that the concrete seawall in the popular Yorkshire coast village is in poor condition and has an estimated serviceable life of approximately ten years, said the council.

They have now approved the appointment of Jeremy Benn Associates (JBA) Limited to design a scheme of works that will address the problems with the wall and subsequently project manage the repair and improvement scheme.

According to the official announcement, “ the scheme will repair and reinforce the wall, which is currently showing significant signs of corrosion and cracking and suffers from poor drainage. Approximately 30% of the panels within the seawall will need replacing and it is expected that others will need to be repaired. Drainage improvements will also form a key part of the scheme .”

Cllr Mike Cockerill, Scarborough Borough Council Cabinet Member for Major Projects, said: “Major repairs and improvements to Robin Hood’s Bay’s concrete seawall are vital for the village’s longer term protection from the power of the sea and the aggressive coastal climate. Following the decision to appoint a contractor, the next step will be for council offers to work with the contractor on developing a detailed design for the scheme that will address the seawall’s poor condition.”

The council expects the detailed design to be completed by spring 2019 and the works to start on site in Robin Hood’s Bay in the autumn of 2019.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago