Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Blenheim Palace: Queen’s Pool Project Kicks Off
Business & Finance

October 23, 2018 · about 7 years ago

Blenheim Palace: Queen’s Pool Project Kicks Off

One of the biggest civil engineering projects ever undertaken at a British stately home, aimed to save ‘the finest view in England’, has officially begun, Blenheim Palace said in their latest announcement. In 2016 planning started for the restoration of Queen’s Pool and vital repairs to the Grand Br

2 minutes read
  • LinkedIn
  • X
  • Email

One of the biggest civil engineering projects ever undertaken at a British stately home, aimed to save ‘the finest view in England’, has officially begun, Blenheim Palace said in their latest announcement .

In 2016 planning started for the restoration of Queen’s Pool and vital repairs to the Grand Bridge. Created by Lancelot ‘Capability’ Brown over 250 years ago, Queen’s Pool has become extensively silted, with 75% of the volume lost and the water quality and ecology degraded.

“This ambitious project will not only reinvigorate the biological health of the lake but also allow vital restoration work to take place to the Grand Bridge, ” according to the official statement.

The £12 million project will include:

What is happening this October?

“ We are lowering the water level for a month to carry out surveys of the bridge and lakes. The dewatering process also allows us to test the contingencies we have in place for the private water supply, begin to manipulate fish stocks and also test the methodology for dredging ,” according to the release.

It will be the most visible part of the project this year and will expose silt both upstream and downstream of the Grand Bridge. It will also expose many rooms in the Grand Bridge which have been flooded for over 250 years since ‘Capability’ Brown first made his mark on Blenheim.

The water level will then be raised back up for November ahead of the Christmas activities.

Works in 2020

The main works to the lake are planned to start in spring 2020 and last through to the winter of that year.

“The Grand Bridge, river catchment and visitor work will start at the same time and run for an expected three years. When we come to dredge the lake, we will drop the water levels again and mechanically remove the relatively dry silt during a 22-week period, ” said Blenheim Palace.

This silt will then be transported via a haul road to the north of the park where it will be spread over around 150 acres of farmland.

This farmland will then be reverted to grassland in keeping with the World Heritage Site.

The work has been supported by West Oxfordshire District Council, Natural England and the Environment Agency, but also involved Thames Water, Universities and voluntary organizations such as the Evenlode Catchment Partnership.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago