Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›City of Ventura to Renew Maintenance Dredging Permit
Business & Finance

October 25, 2018 · about 7 years ago

City of Ventura to Renew Maintenance Dredging Permit

The City of Ventura has proposed to renew their existing permit for the maintenance dredging of the Ventura Keys. According to the Corps, the City calls for the renewal of the existing permit to maintenance dredge up to 350,000 cubic yards of material over a ten-year period, not exceeding 100,000 cu

1 minutes read
  • LinkedIn
  • X
  • Email

The City of Ventura has proposed to renew their existing permit for the maintenance dredging of the Ventura Keys.

According to the Corps, the City calls for the renewal of the existing permit to maintenance dredge up to 350,000 cubic yards of material over a ten-year period, not exceeding 100,000 cubic yards of material per year.

The proposed project is required to maintain channel configurations, and to restore and assure safe navigability within the Keys waterways, providing material for beach replenishment, reported the Corps.

Deposition options include the surf zone at Cell 1 of the Pierpont Bay Groin Field (the first cell north of Marina Park) and the surf zone at the mouth of the Santa Clara River and/or the near shore waters at the mouth of the Santa Clara River.

USACE also added that the dredging and deposition activities would not commence until after Labor Day in September of any year and would cease on or before March 15 of the following year so as to avoid impacts on grunion spawning, least tern and snowy plover nesting, and recreational use of the beach.

The three channels in the City will be dredged to a depth of -12 feet MLLW plus a two-foot overdredge. It is anticipated that the channels would require dredging one or two times over the ten-year maintenance period.

The deadline for sending comments on the proposed work is November 25, 2018.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago