Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Whitehill Road Coastal Protection Works About to Begin
Business & Finance

November 8, 2018 · about 7 years ago

Whitehill Road Coastal Protection Works About to Begin

Construction of two low-crest Geotextile Sand Container (GSC) groynes on the Drummond Cove Foreshore to mitigate coastal erosion at Whitehill Road will begin next week, reports the City of Greater Geraldton. The two 40m long groynes, which will extend across the beach and into the ocean, have been d

1 minutes read
  • LinkedIn
  • X
  • Email

Construction of two low-crest Geotextile Sand Container (GSC) groynes on the Drummond Cove Foreshore to mitigate coastal erosion at Whitehill Road will begin next week, reports the City of Greater Geraldton.

The two 40m long groynes, which will extend across the beach and into the ocean, have been designed to retain sand at Whitehill Road and reduce reliance on temporary sand nourishment operations.

The City Mayor, Shane Van Styn, said that the use of GSC revetments aligns with the community’s values regarding our coastline.

“ By utilizing GSCs the beach can still be enjoyed and at any stage in the future should the GSC revetments no longer be needed they can be easily removed. Implementing this option demonstrates the City’s commitment to work collaboratively with the local community on addressing the challenges of coastal erosion ,” he said.

This adaption measure is consistent with the City’s Draft Coastal Hazard Risk Management and Adaptation Plan (CHRMAP), which was based on the requirements and adaptation hierarchy of Western Australia’s State Planning Policy No. 2.6 – State Coastal Planning Policy (SPP2.6).

Construction of the groynes will be undertaken by local contractor Red Dust Holdings with MP Rogers and Associates providing technical services. Works are scheduled to begin on Monday, 12 November, 2018 and estimated to be completed before Christmas.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago