Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›H&L Contracting Wins Saco River Dredging Deal
Business & Finance

November 20, 2018 · about 7 years ago

H&L Contracting Wins Saco River Dredging Deal

Maintenance dredging of a portion of the Saco River Federal navigation project (FNP) in Biddeford and Saco, Maine, will be completed under the terms of a $3.9 million contract issued recently by the U.S. Army Corps of Engineers, New England District. The dredging work, to be accomplished by H&L Cont

2 minutes read
  • LinkedIn
  • X
  • Email

Maintenance dredging of a portion of the Saco River Federal navigation project (FNP) in Biddeford and Saco, Maine, will be completed under the terms of a $3.9 million contract issued recently by the U.S. Army Corps of Engineers, New England District.

The dredging work, to be accomplished by H&L Contracting, Inc. LLC, of Bay Shores, New York, is scheduled to start in mid-December 2018 and take about 3 months to complete.

“ The project consists of hydraulically dredging a portion of the Federal navigation channel at the mouth of the Saco River which includes an 8-foot deep entrance channel and three 6-foot deep anchorages,” said Project Manager Craig Martin , of the Corps’ New England District, Programs/Project Management Division in Concord, Massachusetts.

Approximately 41,000 cubic yards of required dredging, with another 36,000 cubic yards of 1-foot allowable over depth dredging would bring these areas back to their authorized dimensions. Sandy shoal material dredged from the mouth of the river will be pumped approximately 8,000 feet north to Camp Ellis Beach.

Additionally, a contract option to mechanically dredge a portion of the FNP’s 8-foot deep channel and 6-foot deep maneuvering basin at the city center in Saco is included.

Approximately 22,000 cubic yards of required, and another 13,000 cubic yards of 1-foot allowable over depth dredging of predominantly fine grain sand and silty shoal material will be completed by mechanical dredge and hauled 1.25 miles south to a previously used in-river placement site for disposal.

Dredging and disposal operations will be performed between Nov. 15, 2018 and March 15, 2019 to meet environmental time of year restrictions.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago