Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Van Oord in Australia: Scaling up Great Barrier Reef Coral Restoration
Business & Finance

November 27, 2018 · about 7 years ago

Van Oord in Australia: Scaling up Great Barrier Reef Coral Restoration

A consortium consisting of Van Oord, Australian research institute CSIRO, and Delft University of Technology have reached a new milestone – this week they are testing a new method for large-scale coral rehabilitation at the Great Barrier Reef in Australia. Climate change and coral bleaching have res

2 minutes read
  • LinkedIn
  • X
  • Email

A consortium consisting of Van Oord, Australian research institute CSIRO, and Delft University of Technology have reached a new milestone – this week they are testing a new method for large-scale coral rehabilitation at the Great Barrier Reef in Australia.

Climate change and coral bleaching have resulted in the reef in losing more than half of its coral cover since 1985. The consortium hopes to identify the best method for overcoming a crucial bottleneck in the upscaling of reef rehabilitation.

The consortium partners’ rehabilitation method involves harvesting coral eggs and later transplanting the coral larvae in places where coral is meant to grow.

This is a proven concept that is already being applied on a small scale and in tanks.

In this new test phase, the researchers will analyse on site whether the method can be scaled up. Van Oord’s dredging vessels are collecting vast numbers of coral eggs using specially adapted pump systems.

It is important that the fragile eggs are still alive when they reach the storage tank.

To make their journey as smooth and safe as possible, TU Delft’s and Van Oord’s researchers have spent the past few months optimizing the pumping systems. For example, the pump needs to cause no eddies during suction and has to stay floating on the surface of the water. Also, the type of pump turned out to play an important part in the design.

Over the coming weeks, testing on location will show how the pumping systems really perform in currents and waves. The researchers will be testing two types of pumps and two types of storage tanks in Australia.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago