Verhoef EMC said in its latest release that they have agreed on a contract with Royal IHC for the complete electrical installation of a custom built 2.500kVA dismountable cutter suction dredger (CSD).
The scope of work is consisting of the in-house engineering, system integration, fabrication, installation, full commissioning and testing of the electrical installation.
According to Verhoef, the contract includes:
Engineering work already started and completion is scheduled for the second half of 2019.