Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›BMM Wraps Up Greatham South Flood Alleviation Scheme
Business & Finance

January 9, 2019 · about 7 years ago

BMM Wraps Up Greatham South Flood Alleviation Scheme

Mott MacDonald has just reported that the work on £16 million Greatham South Flood Alleviation scheme has been completed. The BAM Nuttall Mott MacDonald (BMM) joint venture was commissioned by the Environment Agency in 2017 to design and build the second and final phase of the management scheme whic

1 minutes read
  • LinkedIn
  • X
  • Email

Mott MacDonald has just reported that the work on £16 million Greatham South Flood Alleviation scheme has been completed.

The BAM Nuttall Mott MacDonald (BMM) joint venture was commissioned by the Environment Agency in 2017 to design and build the second and final phase of the management scheme which addresses flooding concerns in Port Clarence and Greatham South area in the north of England.

The Environment Agency partnered with two businesses that have a presence in the area, INOVYN gave necessary land for realignment and SABIC provided funding for construction.

Once secured, the BAM Nuttall Mott MacDonald JV was re-commissioned by the Environment Agency at the beginning of 2017, following a successful initial design phase, to provide further detailed design support and construction.

Work included raising existing defenses, building new defenses, installing culverts and habitat development. Environmental impact assessments were performed, and construction was also supervised from an environmental perspective.

Project manager Howard Clapp commented: “ It is fantastic to work on a project that will protect the homes and livelihoods of so many people. The site of the flood alleviation scheme is recognized environmentally because of its importance to seal populations and as a habitat for birds. It’s been great to work on a project where we could provide improvements for both people and local habitats .”

Works on the scheme were completed in December 2018.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago