Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Connecticut River Project on the Table
Business & Finance

January 17, 2019 · about 7 years ago

Connecticut River Project on the Table

The U.S. Army Corps of Engineers, New England District is proposing to perform a riverbank protection project to stabilize approximately 500 linear feet of riverbank along the Connecticut River in Lyme, New Hampshire. According to the Corps, erosion is occurring at a section of river bank along the

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New England District is proposing to perform a riverbank protection project to stabilize approximately 500 linear feet of riverbank along the Connecticut River in Lyme, New Hampshire.

According to the Corps, erosion is occurring at a section of river bank along the western side of River Road, just south of North Thetford Road in Lyme, where the bank is being undermined.

The proposed action consists of placing a stone revetment along a 500-linear-foot section of eroding Connecticut River bank located south of North Thetford Road, and running parallel to River Road. The stone revetment was considered to be the most practical solution to alleviate the erosion problems affecting the area.

To construct the revetment, approximately 5,100 cubic yards of interlocking, 18-inch riprap stone will be placed along the 500-linear foot segment of eroding bank.

The initial phase will involve the excavation of the eroding bank to create a constant slope, as well as to establish a stable foundation for the riprap slope. The bedding material will be composed of an initial 1-foot layer of sand followed by another 1-foot layer of gravel before the larger stone is placed.

The public notice, with more detailed information, is available for review on the Corps website .

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago