Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Hay Point Maintenance Dredging Plan Gets OK
Business & Finance

February 4, 2019 · about 7 years ago

Hay Point Maintenance Dredging Plan Gets OK

The North Queensland Bulk Ports (NQBP) was granted Commonwealth permits last week to conduct maintenance dredging at the Port of Hay Point following a thorough consultation and assessment process. The 10-year permits, issued by the Great Barrier Reef Marine Park Authority, carry conditions that prot

1 minutes read
  • LinkedIn
  • X
  • Email

The North Queensland Bulk Ports (NQBP) was granted Commonwealth permits last week to conduct maintenance dredging at the Port of Hay Point following a thorough consultation and assessment process.

The 10-year permits, issued by the Great Barrier Reef Marine Park Authority, carry conditions that protect the marine environment.

Maintenance dredging at the Port of Hay Point is critical for maintaining port infrastructure and involves relocating sediment which travels along the coast and accumulates over the years where the shipping operations occur, NQBP said.

The 10-year permit allows a total of up to 756,553 cubic metres of maintenance dredge material to be disposed within a previously approved dredge spoil disposal site located in the Marine Park, plus a further 200,000 metres contingency for sediments deposited by extreme weather events such as cyclones.

A small proportion of maintenance dredging is permitted within the Marine Park (up to 33,509 cubic meters).

According to the company’s latest announcement, NQBP’s assessment reports found the risks to sensitive marine environments as a result of the maintenance dredging were predominantly low.

The permits allow for the long-term, sustainable management of maintenance dredging at the port and will safeguard the efficient operations of one of Australia’s most critical trading ports.

The initial maintenance dredging program is proposed to begin in late March and will run for around 40 days.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago