Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Herman to Expand Its Fleet with New Damen Shoalbuster
Business & Finance

February 19, 2019 · about 7 years ago

Herman to Expand Its Fleet with New Damen Shoalbuster

A contract between Damen Shipyards Hardinxveld (DSHa) and Herman Sr. BV for the building of the first diesel-electric Damen Shoalbuster 3514 SD DP2 was inked on January 25, 2019. According to Damen, “the Shoalbuster 3514 SD (shallow draft) DP2 (dynamic positioning 2) will be the first of a new Shoal

1 minutes read
  • LinkedIn
  • X
  • Email

A contract between Damen Shipyards Hardinxveld (DSHa) and Herman Sr. BV for the building of the first diesel-electric Damen Shoalbuster 3514 SD DP2 was inked on January 25, 2019.

According to Damen, “the Shoalbuster 3514 SD (shallow draft) DP2 (dynamic positioning 2) will be the first of a new Shoalbuster class and one of the largest and most sophisticated in the range, being also IMO Tier 3 compliant.”

The Shoalbuster 3514 will be a substantial and versatile working platform, measuring 35 meters in length, nearly 14 meters wide and with a free deck space of 150m².

With a draught of 2.70 meters at full tank capacity and just 2.40 meters at 50% she will be able to access waters inaccessible to other vessels of a similar size and capability. Four Caterpillar C32 ACERT engines will deliver a total of 3,876 bkW (5,280 hp) to four 1900mm nozzles, an arrangement that contributes significantly to her shallow-waters capability.

With 60 tonnes of bollard pull she will also be a powerful and effective towage asset.

Among the many other roles which the Brutus will be capable of taking on are dredging support, PLGR operations, ROV surveys via a 600 x 800mm moonpool, mattress installations, UXO clearance, mooring, pushing, ocean-going towage and general offshore supply vessel duties.

The new vessel is scheduled for delivery by the first half of 2020 and will be named Brutus.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnologyVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

12 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

12 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

13 days ago