Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Matadi Gateway Terminal Dredging Plan in Place
Business & Finance

February 19, 2019 · about 7 years ago

Matadi Gateway Terminal Dredging Plan in Place

The recent call of the 2,500-TEU capacity Safmarine Nuba at the Matadi Gateway Terminal (MGT) – ICTSI Group company – has opened the door to the new shipping system benefits for the Democratic Republic of the Congo (DRC). “The call, which took place at the end of January, marked the first call by a

2 minutes read
  • LinkedIn
  • X
  • Email

The recent call of the 2,500-TEU capacity Safmarine Nuba at the Matadi Gateway Terminal (MGT) – ICTSI Group company – has opened the door to the new shipping system benefits for the Democratic Republic of the Congo (DRC).

“The call, which took place at the end of January, marked the first call by a gearless containership and the first by a vessel with a capacity as high as 2,500 TEUs. The deployment of a vessel of this size unlocks economies of scale as well as provides the most cost-efficient means of serving the capital city of Kinshasa,” ICTSI said in their latest release.

MGT, with support from the Government of DRC, has also a two-step plan in place to realize strategic dredging in the Congo River up to a draught of 12.5 meters, thereby opening the door to Panamax class vessel calls.

According to ICTSI, this will be demand triggered as will a third phase, under development, which will facilitate access for the slightly larger WAFMAX vessels, which will require a draught of 14 meters.

“The MGT is built to handle vessels of up to WAFMAX dimensions and as such the Safmarine Nuba was straightforward to berth and work, ” commented Tim Van Campen, MGT director general. “ We see this as a step on the road to handling even bigger vessels as demand builds, eventually up to WAFMAX dimensions from direct calls.”

The terminal is having a positive impact right along the supply chain, and is delivering tangible practical benefits to cargo owners, a scenario we expect to grow as demand builds, even larger vessels are phased in and the terminal reaps the benefits of comprehensive continuous improvement programs.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago