Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Manila Bay Dredging Continues Despite Bad Weather
Business & Finance

March 13, 2019 · about 7 years ago

Manila Bay Dredging Continues Despite Bad Weather

The Philippines’ Department of Public Works and Highways (DPWH) is looking to take advantage of the El Niño by continuing its dredging and desilting operations in Manila Bay. According to the PNA, DPWH-Bureau of Equipment (BOE) Director Toribio Ilao announced that though the effects of such weather

2 minutes read
  • LinkedIn
  • X
  • Email

The Philippines’ Department of Public Works and Highways (DPWH) is looking to take advantage of the El Niño by continuing its dredging and desilting operations in Manila Bay.

According to the PNA, DPWH-Bureau of Equipment (BOE) Director Toribio Ilao announced that though the effects of such weather condition for some are damaging, for them it is advantageous as the waves and underwater currents are manageable to continue the cleaning activities.

“ It’s good for us because the waves and underwater current are not that strong. The excavator could go farther. The tidal effect is lower than if there’s no El Niño ,” Toribio Ilao said.

Ilao reported that as of Monday, they have collected approximately 3,000 cubic meters of silt and garbage, including 44 rubber tires. Currently, they are operating with three trucks as maximum but they are looking at adding 20 to 30 trucks in the next two weeks.

As for the machines, Ilao said that they have four amphibious excavators and one land-based crawler excavator that are operating from Monday to Saturday.

DPWH Secretary Mark Villar visited the area located near the US Embassy in Manila to personally see the progress of the dredging and desilting operations.

Last week, the DPWH, together with the Department of Environment and Natural Resources, the local government of Manila and other stakeholders, launched the Desilting Operations dubbed “DPWH Sagip Manila Bay” to clean the 1.5-kilometer stretch of the Bay from the Manila Yacht Club breakwater to the US Embassy.

The desilting activities will be divided into five sectors, each ranging from 200 to 300-meter long, until the entire 1.5-kilometer is finished. Each sector will be desilted approximately within 90 to 120 days.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago