Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Beaver Island Restoration Work Underway
Business & Finance

March 21, 2019 · about 7 years ago

Beaver Island Restoration Work Underway

The long awaited Beaver Island Habitat Restoration and Enhancement Project – aimed to dramatically improve the habitat and environmental health on this Mississippi River island – is finally underway and moving forward according to schedule. “The $10 million habitat restoration project is funded by t

2 minutes read
  • LinkedIn
  • X
  • Email

The long awaited Beaver Island Habitat Restoration and Enhancement Project – aimed to dramatically improve the habitat and environmental health on this Mississippi River island – is finally underway and moving forward according to schedule.

“ The $10 million habitat restoration project is funded by the U.S. Army Corps of Engineers Upper Mississippi River Restoration program. This program addresses ecological needs on the Upper Mississippi River System to improve its environmental health ,” said the National Wildlife Refuge System (NWRS) in its release.

The primary goals of the Beaver Island project are the restoration of year round aquatic habitat within the interior lakes, diversification of the forest community, and improving habitat for fish and mussels.

The project includes 1,678 acres within the Upper Mississippi River National Wildlife and Fish Refuge and are federally-owned by the U.S. Fish and Wildlife Service and U.S. Army Corps of Engineers (USACE).

“ Project completion will take two years and all public access is restricted within 200 yards of workers and equipment. The first stage of construction is underway with the clearing of trees along the interior shoreline. Tree cutting must be completed by March 31 due to bat conservation guidelines. Excavated material will subsequently be placed in these areas ,” according to the announcement.

A critical part of the project is to protect Beaver Island’s interior lakes from future sedimentation. A primary source of silt comes from the Upper Cut inlet in Beaver Slough. A rock structure will close off the Upper Cut entrance to ensure long term benefits within the island’s interior, said NWRS.

Sediment will be excavated from the interior access channel and four interior lakes that include Stewart, Blue Bell, Sand Burr and Hulziger. Each area will be excavated to an average eight feet depth that will benefit fish and other aquatic species.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago