Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Preparation Works Underway for Broughty Ferry Scheme
Business & Finance

April 9, 2019 · about 7 years ago

Preparation Works Underway for Broughty Ferry Scheme

Dundee City Council said in its latest announcement that the preparation works for the Broughty Ferry Flood Protection Scheme started this week. Contractor BAM Ritchies will be at various points between Douglas Terrace and Beach Crescent between 8am and 5pm for four weeks, said the council. Investig

1 minutes read
  • LinkedIn
  • X
  • Email

Dundee City Council said in its latest announcement that the preparation works for the Broughty Ferry Flood Protection Scheme started this week.

Contractor BAM Ritchies will be at various points between Douglas Terrace and Beach Crescent between 8am and 5pm for four weeks, said the council.

Investigations operations, which officially started yesterday, will consist of exploratory investigations to determine ground conditions and ground water levels.

The results arising from the investigations will inform the structural design and construction method of the final flood prevention scheme.

It is expected that 80% of the funds required will be supplied by the Scottish Government Capital Grant for Flood Schemes. The remaining 20% funding has been included within the Dundee City Council Capital Plan 2016-2021.

Background

During early 2016, the council sought the views of the communities affected on the preferred option which is a set-back wall solution which will comprise of a one meter high wall to the rear (roadside) of the footway.

Enhancements to the footway will be carried out alongside the wall works.

According to the council, the wall will include openings to allow for public access with gates that can be drawn over should a risk of flooding occur.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago