Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›More Time to Comment on Chicago Area Waterway System DMMP
Business & Finance

June 20, 2019 · about 7 years ago

More Time to Comment on Chicago Area Waterway System DMMP

The U.S. Army Corps of Engineers, Chicago District, is extending the public comment period once again for the draft Chicago Area Waterway System (CAWS) Dredged Material Management Plan (DMMP) and integrated Environmental Impact Statement. The original 45-day comment period was scheduled to run from

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Chicago District, is extending the public comment period once again for the draft Chicago Area Waterway System (CAWS) Dredged Material Management Plan (DMMP) and integrated Environmental Impact Statement.

The original 45-day comment period was scheduled to run from May 3, 2019, through June 17, 2019.

It was then extended to July 2, 2019, based on requests received from project stakeholders and the public during three meetings that the Chicago District hosted in May 2019.

Now, the public comment period is being extended one more time as a result of ongoing coordination with study stakeholders in order to ensure that they are better able to review and comment on the study, reported the Corps.

The public review period will now officially close on Aug. 1, 2019.

The purpose of the study is to identify and evaluate alternatives for dredged material management for the CAWS, which is made up of six federal navigation projects: Calumet Harbor and River; the Calumet-Saganashkee (Cal-Sag) Channel; Chicago Harbor; Chicago River; the South Branch of the Chicago River; and the Chicago Sanitary and Ship Canal.

USACE also added that they have analyzed alternatives that could safely confine 20 years’ worth of dredged material generated in the operation and maintenance of the federal navigation channels of the CAWS.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago