Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Quai de Flandres Extension Inaugurated
Business & Finance

June 27, 2019 · about 7 years ago

Quai de Flandres Extension Inaugurated

The extension of the Dunkerque Port’s Quai de Flandres was officially inaugurated on June 20 in the presence of Patrice Vergriete, Mayor of Dunkerque, Christine Cabau-Woehrel, Executive Vice-President in charge of assets for the CMA CGM Group, Stephane Raison, President of the Executive Board of Dun

1 minutes read
  • LinkedIn
  • X
  • Email

The extension of the Dunkerque Port’s Quai de Flandres was officially inaugurated on June 20 in the presence of Patrice Vergriete, Mayor of Dunkerque, Christine Cabau-Woehrel, Executive Vice-President in charge of assets for the CMA CGM Group, Stephane Raison, President of the Executive Board of Dunkerque-Port, and other officials.

The length of the Quai de Flandres is now 1.785m, of which nearly 1,000m have been dredged to -17,30m depth, making it possible to simultaneously berth two Ultra Large Container Ships (ULCS) 400m long in all tidal conditions.

According to an official announcement, berthing conditions at the ship terminal have also been improved by replacing all the marine fenders and reinforcing the mooring bollards.

“The layout and installation work included earthworks of nearly 650.000m³ of spoil, the use of 10.000 tons of steel and 15.000 cubic meters of concrete, the dredging of several million m³ of sand and the covering of 3.5 hectares of quayage,” said the port.

During the project, several compensatory measures, consisting of wetlands, mosaics of environments and dunes, have also been recreated on some 35 hectares of land belonging to the Port of Dunkerque.

The new wharf and its facilities were handed over to Terminal des Flandres, operator of the container terminal.

All the extension work on the Quai de Flandre was carried out under Dunkerque-Port Project Management and was co-financed by the State.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago