Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Kennebec River Dredging Plan Unveiled
Business & Finance

August 6, 2019 · about 7 years ago

Kennebec River Dredging Plan Unveiled

Bath Iron Works is seeking a permit from the U.S. Army Corps of Engineers, New England District, to conduct work in waters of the U.S. in conjunction with maintenance dredging in the Kennebec River in Bath, Maine. According to the USACE’s latest release, Bath Iron Works is seeking to renew a previou

1 minutes read
  • LinkedIn
  • X
  • Email

Bath Iron Works is seeking a permit from the U.S. Army Corps of Engineers, New England District, to conduct work in waters of the U.S. in conjunction with maintenance dredging in the Kennebec River in Bath, Maine.

According to the USACE’s latest release, Bath Iron Works is seeking to renew a previous 10-year permit to conduct periodic maintenance dredging activities associated with its shipbuilding operations in the Kennebec River in Bath.

“Corps permit NAE-2007-02528, issued Nov. 5, 2009, authorized Bath Iron Works to dredge up to 70,000 cubic yards at their dry dock sinking basin; up to 4,000 cubic yards at their dry dock landing grid; and up to 12,000 cubic yards at berthing piers 1, 2 and 3. Dredged material from the sinking basin has been disposed of downstream, at an in­river site just south of Bath at Bluff Head. Dredged material from the other sites has been disposed of at an upland, non-wetland location. This permit expires on Dec. 31, 2019,” said USACE in its announcement.

Dredge volumes are expected to remain the same on average but actual quantities for individual dredge events may vary depending on the frequency and degree of shoaling.

The first maintenance dredging event is proposed to occur during the winter of 2019/2020 (dry dock sinking basin, Pier 2, and the dry dock landing grid).

The deadline for submitting the comments on this dredging plan is September 5, 2019.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago