Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Soybean Farmers Call for Dredging of Lower Mississippi River
Business & Finance

August 29, 2019 · about 7 years ago

Soybean Farmers Call for Dredging of Lower Mississippi River

The United Soybean Board (USB) recently announced a $2 million allocation to help offset the planning, design, and research costs of deepening the lower Mississippi River from 45 ft. to 50 ft. As the USB reported, the 256-mile stretch of the Mississippi River from Baton Rouge, Louisiana, to the Gulf

2 minutes read
  • LinkedIn
  • X
  • Email

The United Soybean Board (USB) recently announced a $2 million allocation to help offset the planning, design, and research costs of deepening the lower Mississippi River from 45 ft. to 50 ft.

As the USB reported, the 256-mile stretch of the Mississippi River from Baton Rouge, Louisiana, to the Gulf of Mexico accounts for 60% of U.S. soybean exports, along with 59% of corn exports – by far the leading export region for both commodities.

There is a growing effort among Mississippi River stakeholders, including agriculture, to promote the dredging of the lower river shipping channel from 45 ft. to 50 ft. in depth, the USB said.

The overall project is estimated to cost $245 million and would occur in three phases. Two of the phases will be cost-shared between the federal government (75%) and non-federal sources (25%). The State of Louisiana has been designated as the obligated non-federal entity.

The phase one includes dredging from Venice, Louisiana (approximately Mile 10 Above Head of Passes [AHP]) to the Gulf of Mexico. Removing this bottleneck would provide a 50-ft. deep channel to approximately Mile 154 [AHP] of the river.

A substantial number of soybean and grain export terminals are located within this portion of the river. The estimated cost of this phase is $100 million.

Given a 75% federal and a 25% non-federal cost share, the federal obligation would be $75 million, and the non-federal obligation would be $25 million.

The phase two includes dredging from Mile 154 AHP to Baton Rouge, Louisiana (Mile 232 AHP). The remaining soybean and grain export terminals would be included in the 50-ft. shipping channel upon completion of this phase.

The estimated cost of this phase is $65 million. Given a 75% federal and a 25% non-federal cost share, the federal obligation would be $48.75 million, and the non-federal obligation would be $16.25 million.

The third phase calls for the relocation of pipelines buried under the northern portion of the shipping channel. The estimated $80 million cost of doing so would be split evenly between the State of Louisiana and the pipeline owners.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago