Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Contract Awarded for ‘Typhoon-Proof’ Shenzhen Coast
Business & Finance

September 16, 2019 · about 6 years ago

Contract Awarded for ‘Typhoon-Proof’ Shenzhen Coast

KCAP + FELIXX have won the international competition for the redevelopment of the 130-kilometer coastline of Dapeng, a green peninsula in the bay between Hong Kong and Shenzhen. In September 2018, the typhoon Mangkhut damaged the infrastructure of the peninsula to various degrees. An international c

2 minutes read
  • LinkedIn
  • X
  • Email

KCAP + FELIXX have won the international competition for the redevelopment of the 130-kilometer coastline of Dapeng, a green peninsula in the bay between Hong Kong and Shenzhen.

In September 2018, the typhoon Mangkhut damaged the infrastructure of the peninsula to various degrees.

An international competition was launched to develop a plan to restore the coastline and raise protection standards against the more frequent occurrence of extreme weather events.

KCAP+FELIXX developed the ‘Triple dike strategy’, a multifaceted dike system that allows for an integrated approach towards the climate adaptive reorganization of the shore.

For 32 kilometers of coastline, the contractor is developing this concept into six strategic implementation projects. Realization starts this year, and is expected to be completed in 2021.

The triple dike moves away from a generic protection wall along the coast, towards the creation of three development zones, carefully embedded in current conditions and responding to the specific future needs of every single area.

The 1st ‘outer’ dike zone increases the resiliency through wave attenuation, erosion reduction and the enhancement of sedimentation.

The 2nd ‘middle’ dike is an elevated embankment, to stop the storm surge and the water pushed up by the waves. It’s not a big wall but a multifunctional zone: an exciting hilly park, an elevated waterfront with urban promenades, a tidal park or even a public building.

The 3rd ‘inner’ dike is a hybrid structure which manages the rainwater following the principle of a sponge city.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceProject & Tenders

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

29 days ago

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Vancouver: Dredging work at Second Narrows set for September
Business development

Port of Vancouver: Dredging work at Second Narrows set for September

29 days ago
United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago