Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Inauguration of Levvel-Blocs Facility in Harlingen
Business & Finance

September 27, 2019 · about 6 years ago

Inauguration of Levvel-Blocs Facility in Harlingen

The Levvel consortium (BAM, Van Oord and Rebel) inaugurated the Levvel-blocs production facility in Harlingen today. The facility is producing the concrete armor units that will reinforce the Afsluitdijk Dam in the years ahead. Provincial executive councillor Avine Fokkens (Province of Fryslân), per

2 minutes read
  • LinkedIn
  • X
  • Email

The Levvel consortium (BAM, Van Oord and Rebel) inaugurated the Levvel-blocs production facility in Harlingen today.

The facility is producing the concrete armor units that will reinforce the Afsluitdijk Dam in the years ahead.

Provincial executive councillor Avine Fokkens (Province of Fryslân), performed the opening ceremony.

“The province is happy that Fryslân has a factory with such an innovative product. The ecological footprint is small and transports over water are short because the Levvel-blocs are produced near the Afsluitdijk, in Harlingen. This fits the character of the Afsluitdijk perfectly. We are also satisfied that many regional companies have helped to set up this factory. Just like many companies from this region are now helping to strengthen the dyke,” Avine Fokkens said.

Fully automated production

The Levvel-blocs will be produced in an automated carousel system with more than one hundred revolving steel moulds.

The system is unique in the marine engineering industry. The process begins by filling the mould with concrete.

Once the concrete has hardened, the mould is removed. Production workers inspect the empty moulds, remove any remaining traces of concrete, and prepare them for the next casting.

The facility produces a Levvel-bloc approximately every nine minutes and can turn out at least one hundred blocks a day.

Transport by waterway

A large gantry crane moves the Levvel-blocs to the adjacent storage depot, where a loading dock has been constructed.

The same crane loads the blocks onto ships for transport to the Afsluitdijk.

Upon arrival, the blocks are installed on the dam straight from the ship to avoid disrupting road traffic as much as possible.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago