Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Damen Makes Record Delivery of Customized CSD350 to Brazil
Business & Finance

November 1, 2019 · about 6 years ago

Damen Makes Record Delivery of Customized CSD350 to Brazil

Only four months after the signing of the contract, Damen successfully shipped a fully customized Cutter Suction Dredger (CSD) 350 to Brazil. The standard dredger was adapted to meet Brazilian Naval requirements and received additional options as per customer request. The CSD350 is the first station

2 minutes read
  • LinkedIn
  • X
  • Email

Only four months after the signing of the contract, Damen successfully shipped a fully customized Cutter Suction Dredger (CSD) 350 to Brazil.

The standard dredger was adapted to meet Brazilian Naval requirements and received additional options as per customer request.

The CSD350 is the first stationary dredger Damen has delivered to Brazil.

Many countries – Brazil not being an exception – have their own regulations for outfitting vessels. Therefore the standard suction dredger from stock has been adapted accordingly.

Moreover, the customer, Construtora Vale Verde, ordered a number of options. These include a non-return valve in the discharge pipe line, a wedge piece for shallow water dredging, Damen remote monitoring system as well as a navigation package for maximizing safety on the job.

The CSD350 has been designed to dredge inland waters at a dredging depth between -1 m and -9 m water depth. It is fitted out with a 55 kW cutter head for breaking up compacted soils, and the in-board dredge pump is powered by a 447 kW diesel engine.

For transport purposes, the dredger can be fully dismounted – quite practical considering that its first dredge job will be located some 500 km from its port of arrival, Vitoria.

The dredger left Damen Dredging Equipment in Nijkerk, the Netherlands on five trucks – one for the main pontoon, one for both side pontoons and spuds together, one for the suction ladder and one for the separate container shipping, the operating cabin and various smaller items such as the navigation mast.

The dredger arrived in Brazil at the end of October, where it will be swiftly assembled by Damen, Vale Verde and local agent Endratech engineers, thus demonstrating clearly the benefits of Damen’s philosophy of standardization.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

13 days ago

Tender launched for Gioia Tauro dredging
Business development

Tender launched for Gioia Tauro dredging

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

13 days ago
Tender launched for Gioia Tauro dredging
Business development

Tender launched for Gioia Tauro dredging

14 days ago