Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Coastal Protection Work at East Point Lighthouse Begins
Business & Finance

November 3, 2019 · about 6 years ago

Coastal Protection Work at East Point Lighthouse Begins

A contractor for the New Jersey Department of Environmental Protection (NJDEP) is set to begin work on an interim project to protect Cumberland County’s East Point Lighthouse – an icon of the Delaware Bay region and the state’s second oldest lighthouse – from storm surge and flooding. The $460,150 p

1 minutes read
  • LinkedIn
  • X
  • Email

A contractor for the New Jersey Department of Environmental Protection (NJDEP) is set to begin work on an interim project to protect Cumberland County’s East Point Lighthouse – an icon of the Delaware Bay region and the state’s second oldest lighthouse – from storm surge and flooding.

The $460,150 project will be implemented by Cape May County-based Walters Marine Construction, using a grant the State Historic Preservation Office secured from the National Park Service.

“This project will provide protection while long-term solutions are evaluated and developed to protect the East Point Lighthouse from storms and sea-level rise,” NJDEP Commissioner Catherine McCabe said.

“We continue to work closely with local officials, the state legislative delegation and the Maurice River Township Historical Society on developing a long-term plan to protect this iconic beacon that stands as a symbol for the Delaware Bay region and its rich maritime heritage.”

The interim protection system consists of a geotube, which is an 8-foot-diameter tube made of a durable synthetic membrane filled with sand.

A series of mattresses also filled with sand and made of durable synthetic membrane, will be placed along the front edge of the geotube. This system will extend 570 feet, running from the public boat ramp to higher ground along the bay.

Construction is expected to be completed by the end of the year.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago