Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Getting Ready for South Wave Break Island Dredging
Business & Finance

November 14, 2019 · about 6 years ago

Getting Ready for South Wave Break Island Dredging

Works contributing to safe and navigable access to the South Wave Break Island channel in the Broadwater are set to begin today, Gold Coast Waterways Authority (GCWA) reports. GCWA CEO, Hal Morris, has confirmed that a local dredging contractor will start setting up on site and will kick off dredgin

1 minutes read
  • LinkedIn
  • X
  • Email

Works contributing to safe and navigable access to the South Wave Break Island channel in the Broadwater are set to begin today, Gold Coast Waterways Authority (GCWA) reports.

GCWA CEO, Hal Morris, has confirmed that a local dredging contractor will start setting up on site and will kick off dredging on 25 November, with work expected to wrap up in time for the holiday season.

“The South Wave Break Island channel, also known as the Grand Channel, is a key connection for people travelling between the eastern and western areas of the Broadwater to access the waterways network,” said Morris.

“Maintaining ongoing access to our waterways is vital for the marine, tourism and recreation industries.

“Our waterways support 6,000 direct and indirect jobs and contribute $770 million directly and indirectly to our local economy every year.

“That’s why we’re investing $532,000 to keep this channel safe and accessible for waterways users.”

Mr Morris also added that routine surveys had shown significant shoaling has occurred in the channel, reducing available depths to less than one metre below Lowest Astronomical Tide (LAT) in some areas.

Almost 22, 000 cubic meters of clean sand will be removed from the channel during the dredging campaign.

The dredging works are part of the Gold Coast Waterways Authority’s $27.6 million Waterways Management Program.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago