Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Nigeria: Modelling Coastal Defenses by HR Wallingford
Business & Finance

November 25, 2019 · about 6 years ago

Nigeria: Modelling Coastal Defenses by HR Wallingford

A 3D scale model of a Nigerian beach near Lagos has been put through its paces this month in HR Wallingford’s modelling hall. New coastal defenses are needed where the beach has retreated at the residential Maiyegun Beach Estate following major development farther along the coast. The designers of t

1 minutes read
  • LinkedIn
  • X
  • Email

A 3D scale model of a Nigerian beach near Lagos has been put through its paces this month in HR Wallingford’s modelling hall.

New coastal defenses are needed where the beach has retreated at the residential Maiyegun Beach Estate following major development farther along the coast.

The designers of the coastal protection scheme, CDR International, asked HR Wallingford to build the model to show how the proposed sea defenses would influence the response of the beach.

“Constructed in one of our wave basins, the model represents an embayment between two groynes with a low crested breakwater between them. The bathymetry (or seabed) has been replicated in the vicinity of the breakwater and model sand was used to recreate the beach,” HR Wallingford said.

“Our engineers investigated alternative designs of the low-crested breakwater structure and the response of the beach behind the structure. The scheme was tested under five sea states – the first two represented the frequently occurring conditions on the beach and the other three represented more extreme storms, with less frequent return periods. After each test the model was surveyed by a 3D laser scanner.”

HR Wallingford has also carried out 2D modelling in one of their flumes to collect further data about the breakwater section, using a combination of wave transmission and armor stability testing.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago