Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Lincolnshire Flood Protection Works Underway
Business & Finance

December 4, 2019 · about 6 years ago

Lincolnshire Flood Protection Works Underway

Repairs are now underway on flood banks damaged by recent wet weather, with Environment Agency teams using specialist equipment to restore protection to homes, businesses and agricultural land in Lincolnshire. Work started over the weekend to fix the breach at the Barlings Eau using pontoons and amp

1 minutes read
  • LinkedIn
  • X
  • Email

Repairs are now underway on flood banks damaged by recent wet weather, with Environment Agency teams using specialist equipment to restore protection to homes, businesses and agricultural land in Lincolnshire.

Work started over the weekend to fix the breach at the Barlings Eau using pontoons and amphibious diggers to access the riverbank.

Meanwhile, repairs are also underway at Timberland Delph, where Environment Agency teams moved 100 1-tonne sandbags and equipment into place over the weekend to help protect the bank from further damage.

Pumps are shifting floodwater from the farmland and soon long-reach diggers will set to work plugging the breach with an estimated 1,000 tonnes of clay. Once the clay is in place, piles will be installed to strengthen the bank.

Temporary repairs also remain in place on the Billinghay Skirth, where a number of homes have been protected while engineers plan a permanent fix.

Elsewhere around the county, inspections are being carried out and smaller repairs are underway to fix some locks, pointing doors, and banks that overtopped, eroded, or experienced seepage when they were under pressure from the high volume of water for a prolonged period of time.

Over the coming days and weeks, Environment Agency teams will continue to carry out inspections, monitor defenses, and carry out any further repairs as needed.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago